All piping shall be secured against movement. Provide water hammer arrestors in accordance with for emergency showers and eye wash stations and lavatories, and also eliminates the need to insulate Vertical storm piping should avoid offsets below the uppermost floor line. … Retrieve Here

PDF file DIVISION 15 – MECHANICAL
Provide offsets as required to meet space requirements and to avoid interference with other trades. Gas piping (buried) – PVC wrapped Schedule 40 black steel gas service piping with malleable screwed Insulate fan coil unit condensate drain pipe with 1/2" Armaflex inside building. … Visit Document

Word file Www.neco.navy.mil
Do not bury, conceal, or insulate piping until. it has been inspected, tested, and approved. fillet welds, bends, loops, offsets, and preparation and cleaning. of pipe shall be in accordance with ASME B31.1. … Retrieve Document

PDF file PLUMBING SYSTEMS Codes: Acid Waste
insulate these lines. Hot and tempered water systems shall be recirculated to causing a safety hazard. Vertical storm piping should avoid offsets below the uppermost floor line. … Access This Document

PDF file HVAC SPECIFICATIONS
Provide rises, drops and offsets as required. bring areas of potential conflict to the engineers attention. insulate all piping with 1 inch thick fiberglass insulation with standard vapor barrier jacket. … Doc Retrieval

Word file Section 23 07 11 – HVAC, PLUMBING, AND BOILER PLANT INSULATION
Except for specific exceptions, insulate all specified equipment, and piping (pipe, fittings, valves, accessories). Plumbing piping as follows: 1) Body of roof and overflow drains horizontal runs and offsets (including elbows) of interior downspout piping in all areas above pipe … Fetch Content

PDF file Installation && SService Manual TLM, TTLD, TTLF, TTSSD
No way to avoid this, insulate the piping for the portion that runs through the other cases. O.D. ‘X’ Length – (in inches) for Linear Expansion of: ‘L’ Developed Length of Expansion Offsets … View Full Source

Word file Energy Audit For:
Insulate steam/hot water piping Isolate off-line boilers Recommended measures which also renew the building and its plant and equipment, and thereby offsets to future capital requirements … Fetch Full Source

Word file HVAC DESIGN
Provide expansion loops, offsets, anchors, and guides as required to accommodate pipe thermal expansion Provide double wall pre-insulated boiler stack piping per the following requirements. In lieu of double wall stack piping, insulate boiler stacks as well as diesel engine exhaust … Read Here

PDF file Sealing SenSe
Neers with a tool for designing complete piping sys- Rubber expansion joints dampen and insulate against manent offsets. The custom fit units are easier to install and will have a longer, … Read More

PDF file Blowdown Tanks For Process Steam Boilers
Limit the number of elbows in vent piping to two 45º offsets. 3. Do not use plastic pipe or fi ttings. 4. Do not insulate the tank. 5. For multiple boiler connections, continuous blowdown systems or frequent blowoff operations – an aftercooler may be required to keep the tempered water outlet temperature at … View Full Source

PDF file LS3P ASSOCIATES LTD. Heide Trask New Auditorium SECTION 15000 …
Insulate all water piping inside the building as hereinafter specified. The drawings accompanying these specifications indicate diagrammatically the general location of the ducts, piping, and equipment and do not show all offsets … Retrieve Here

Word file Automatic Waste Neutralization System
Do not add extra fittings or make additional offsets. If piping configuration requires modification to avoid conflicts, notify Insulate all horizontal piping and vertical tailpieces to bottom of roof deck. … Doc Viewer

Word file SECTION 33 63 00, STEAM ENERGY DISTRIBUTION
A. Factory-built devices, inserted in pipe line offsets in groups of two or three as shown to absorb cyclical pipe movement which results from //F. Seismic Braces and Restraints: Do not insulate piping within 300 mm (one-foot) of device until device has been inspected by RE/COTR. … View This Document

Word file GENERAL PROVISIONS
Where an item is reasonably necessary but not specifically mentioned, such as duct hangers or transitions, piping offsets, drains, etc., for a A. Domestic Cold Water Piping: Insulate piping located in interior spaces as specified below. … Fetch Content